Canada’s major healthcare and hospital construction projects

In order to recover from the economic impacts COVID-19, Canada is committed to heavy infrastructure spending. One of the main sectors set to benefit from this increased infrastructure spending is hospital construction. This article is your definitive guide to Canada’s ongoing and upcoming hospital construction projects. 

Below is a guide of active hospital construction projects in Canada, categorized in terms of preconstruction or project delivery phase.  

Interested in working on one of these projects? Get in touch.

Outpost Recruitment is a leading talent agency that works with both local and international players in the buildings sector. Our clients include general contractors, subcontractors and consulting firms (program management and engineering).

Outpost Recruitment specialises in the recruitment of construction professionals across the following areas:

  • Executive Leadership
  • Operations 
  • Project Management
  • Commercial Management
  • Design Management
  • Site Supervision

 

Projects in Preconstruction Stage

Click any project title for more information.

 

Projects in Construction Phase

Click any project title for more information.

 

Projects in Preconstruction Stage

St Paul’s Hospital, Vancouver – DB – $1.9bn

The new hospital and health campus to be constructed at a new greenfield site will have capacity for up to 548 beds, which includes 115 net new beds. The site will be the home of several leading provincial programs and referral centres, including for heart and lung care, renal, eating disorders and specialty surgeries and transplants.

Status: RFP stage.  Project set to be awarded by Sept 2020. Due to open by 2026.

Lions Gate Hospital, Vancouver – $190m DB

Phase 3 of the Lions Gate Hospital Redevelopment Project. The scope of the project includes the design and construction of a new six-story acute care facility and minor renovations on Levels 0-2 in the adjacent Paul Myers South Tower and Northern Expansion buildings.

Status: RFP submitted in Q3. Award expected in Q1.

Burnaby Hospital, Vancouver – $205m DBF / $185m CM

The design and construction of a new 6-level Inpatient/Outpatient Tower, a new 5-level expansion to the south side of the existing Support Facilities Building, renovations to levels 2-4 of the Support Facilities Building, and levels 0 and 1 of the Nursing Tower, including select mechanical and electrical elements and demolition of the Cascade and West Wing Buildings.

The construction cost of the Project is estimated to be approximately $390 million. The DBF Scope construction value is anticipated to be approximately $205 million and the CM construction value approximately $185 million.

Status: RFP issued in June 2020. Contract award in May 2021.

Mills Memorial Hospital Redevelopment, Terrace, BC – $500m DBF

Development of a new, approximately 26,440 square-metres (284,500 square-feet) acute care hospital and integrated services facility. The hospital will be a centre for trauma services, orthopedic surgeries, pathology, radiology, clinical support and pharmacy services, as well as a training site for medical students in the Northern Medical Program.

Status: RFP issued in Feb 2020. 

Royal Columbian Hospital Redevelopment Phase 2&3, Greater Vancouver – $1.2bn DBF

Phase two will include a new 350-bed acute care tower on the north side of the hospital with multiple floors for acute and critical care patients, an Emergency Department with a satellite medical imaging unit, an interventional floor with operating rooms, interventional radiology and cardiology suites, recovery suites, an underground parkade, main entrance, and rooftop heliport. Phase two will also incorporate energy centre equipment, information management/information technology infrastructure, and demolition of some existing buildings.

Phase three will include expansion of support areas such as the laboratory, pharmacy, medical imaging, cafeteria, administration offices and ambulatory care. It will also include expansion of pediatric and neonatal intensive care units, and conversion of some four-bed patient rooms into single or semi-private rooms.

Construction on phase two is expected to run 2020 to 2024, and phase three is expected to complete in 2026. The hospital will remain fully operational throughout construction.

Status: Client is currently negotiating with one vender.

Stuart Lake Hospital Redevelopment, Fort St. James, Northern BC – $116m DBF

Development of a new Stuart Lake Hospital to serve Fort St. James and the surrounding area. Design and construction of a new hospital with 9 in-patient acute beds, 18 long-term care beds, emergency care, medical imaging, laboratory, and supporting services and Primary Care Clinic. Includes the demolition of the existing hospital, construction of surface parking, landscaping, and redundant emergency access.

Status: RFQ issued in June 2020.

West Lincoln Memorial Hospital, Greater Toronto Area – P3

Scope involves constructing a new, larger hospital on the property behind the existing facility. 

Status: RFQ is expected to be released in early 2021.

Corner Brook Acute Care Hospital, Newfoundland P3 DBFM $700m

The new 7-storey, 600,000 square-foot hospital will be connected to the 145-bed long-term care facility that Plenary Health is currently building on the site. It will have 164 beds with the same services currently provided at Western Memorial Regional Hospital, as well as an expanded cancer care program, including radiation services.

Status: Started in late 2019. Due for completion in 2023.

Cariboo Memorial Hospital Redevelopment, Williams Lake, BC $147m

Development of new clinical and support spaces that will be constructed in a new expansion and in renovated space on the existing Cariboo Memorial Hospital site. This includes the emergency department, medical/surgical inpatient units, maternal care and women’s health, mental health and substance use inpatient unit, pharmacy services and University of British Columbia faculty of medicine academic space.

Status: RFP to be issued in Q3 2020. Due for completion by 2025

Kingston General Hospital Development Phase II, Kingston, ON – $500 DBF

The redevelopment will see four buildings torn down and replaced with a tower of between 8 to 12 storeys, and within it will be operating rooms, a pharmacy, neonatal ICU, labs, a data centre and the emergency department.

Status: RFP due to be issued in Fall 2020.

Bowmanville Hospital Redevelopment, Clarington, ON – $<200m

Construction of a new hospital wing, which will replace the existing north wing, along with a new emergency department, surgical services, critical care unit, inpatient units and diagnostic imaging.

Status: RFP in Winter 2021.

Richmond Hospital – Acute Care Tower – TBD

The 9-storey project includes a new emergency department and intensive care unit, and a new medical imaging unit. It will add 110 new beds, bringing the total at the hospital to 350.

Status: RFQ expected in 2021.

Nova Scotia Hospital Centre QEII Redevelopment – $2bn P3 DBF

Two components: the Halifax Infirmary expansion and the Bayers Lake outpatient centre ($259m).

Status: RFP submission for infirmary expansion in Dec 2020. Bayers Lake contract awarded on Aug 21.

Projects in Construction Phase

Surgeon standing in the Vancouver General Hospital's Surgical Centre
The Vancouver General Hospital’s Surgical Centre is on track to get a major upgrade in the coming years. Photo credit: Province of British Columbia.

St. Michael’s Hospital Redevelopment, Toronto – $300m DBF

The project will include the construction of a new 17-storey patient care tower at the corner of Queen and Victoria Streets, and the renovation of approximately 150,000 square feet of existing space.

Status: Change of contractor so the original completion date has been extended.

Cortellucci (MacKenzie) Vaughan Hospital, Toronto – $1.2bn DBFM

The new Cortellucci Vaughan Hospital will include a state-of-the-art emergency department, modern surgical services and operating rooms, specialized ambulatory clinics and intensive care beds.

Status: Due for completion by 2021.

Michael Garron Hospital – Phase 1 Patient Care Tower, Toronto – $411m DBFM

The project involves the construction of a new 8-storey patient care tower and 3-storey connection, as well as demolition of some existing space and renovations to the existing hospital. The project will add up to approximately 550,000 square feet to the existing hospital. The project also involves renovation works of approximately 100,000 square feet of select areas within the existing hospital.

Status: Completion by 2022.

Hospital for Sick Kids, Toronto – $2.4bn DBFM

There are three phases to the project, which are expected to take a total of 10 years to complete:

A new 22-storey Patient Support Centre (ground was broken on this project in October 2019), the Peter Gilgan Family Patient Care Tower, and renovations to the existing campus.

Status: Patient Support Center due for completion by 2022. Remaining aspects due by 2030.

Calgary Cancer Centre, Calgary – $1.4bn DBFM

The new Calgary Cancer Centre (CCC) will be a world-class health-care facility and academic centre for the provision of cancer services in Southern Alberta. The CCC will be built at the Foothills Medical Centre (FMC) site on the current parking Lot 7. The facility will increase cancer care capacity in Southern Alberta by consolidating and expanding existing services in the Calgary Zone to support integrated and comprehensive cancer care, as well as clinical, academic and research needs. The CCC will support and deliver interdisciplinary and integrated care based on a philosophy that accommodates research, education, and patient- and family-focused care, and improves patient outcomes.

Status: Completion by 2023.

Grande Prairie Hospital, Grand Prairie, AB – $650m DBFM

This new 64,000-square-metre hospital is expected to provide 200 beds, a cancer care centre, and a nursing and medical careers-training facility from the Grande Prairie Regional College.

Status: Completion by 2020.

Quebec City University Hospital, Quebec, QB – $2bn

The first phase of the multi-phase project includes the construction of the Integrated Cancer Centre, along with a new generator building, power plant, and parking. As of September, Phase 1 had reached 60 percent completion. The Integrated Cancer Centre is currently on schedule to welcome its first patient in December 2020.

Status: Completion of all phases by 2025.

Centre hospitalier de l’Université de Montréal (CHUM), Montreal, QB – $3.6bn P3

This next phase consists of outpatient services, clinical and administrative offices, as well as an amphitheatre and parking lots. The new 772-room, 21-storey hospital is intended to consolidate the activities of the CHUM in one location.

Phase 1 delivered by OHL and Laing O’Rourke. Phase 2 performance was taken over by a local contractor.

Status: Ongoing.

Royal Inland Hospital – Patient Care Tower (PCT), Kamloops, BC – $417m

Construction will occur in two phases. The first involves design and construction of the tower, which will house 11 operating rooms, mental health and medical/surgical beds, a surgical suite, a perinatal centre with labour and delivery rooms, obstetrics and postpartum beds and a neonatal intensive-care unit. The second phase involves renovation and expansion of the emergency department, pediatric ward, post-anesthetic recovery ward and the morgue. More parking stalls will also be added to the main hospital structure. The plan is to enlarge the ER to the area where the main hospital elevators are located.

Status: The tower is expected to open in 2022, with the second-phase expansion expected in 2024.

Vancouver General Hospital – Surgical Centre / Upgrades, Vancouver, BC – $102.4m

Expansion of the surgical centre and upgrading a number of other areas in and around the hospital to help serve patients and families better. The project includes 16 new state-of-the-art operating rooms at the Jim Pattison Pavilion, a 40-bed hospital unit for care before and after surgery, new communication systems to manage activities for health professionals across two operating floors, upgraded infrastructure and additional storage and new administrative spaces.

Status: Completion by 2021.

Peach Arch Hospital Expansion – Emergency Department / Upgrades, Surrey, BC – $83.7m

Undergoing an emergency department expansion and upgrades to better serve the growing populations in White Rock and South Surrey. The project will be completed in two phases, featuring an expanded emergency department, five upgraded perioperative suites (operating rooms), and an expansion and renovation of the medical device reprocessing department. The expansion and upgrades are part of Fraser Health’s commitment across the region to modernize the health care network, build capacity and improve timely access to quality, patient-centred care closer to home.

Status: Ongoing.

St. John’s Mental Health and Addictions Facility, St John’s, NF – $330m

Six story, 102-bed hospital with 60-bed hostel to replace the Agnes Cowan Hostel, Parking garage for 1,000 vehicles, Modern features, like an art studio and a therapeutic mall terrace.

Status: Construction starts in Spring 2021 and completion by 2024.